Monday, November 15, 2010

Arse-Freeze Punch List

With 12 days to go the punch list is long and on quick glance daunting. However, we should be able to knock several of these out quickly.


Electrical Systems
Items
Status
Comments
1. Find some spare parts, currently have none.
Done
Found what I need, Might want spare ECU if we can find one. Struck out there, going to go with what we have.
2. Try to add the Z32 fuel pump controller
Done!
We have the controller, seems to work fine
3. Fix the Nissan Consult so we can plug in a laptop
Done
Will Run without it KISS
4. Wire up the Data and Video
Done
Done!
5. Put my notes into something to take trackside (not that anything will fail...)
Done!
They are up to date, just need to bind them. Copy sent to Doug for backup.
6. Find some lights and mount and wire them
We'll solve this one trackside if needed. Car is wired (with switch and power) so just need lights mounted and then we'll cable them up.
7. Need a connector for the fan, and wire to the relay
Done!
Old wiring harness with connector found, installed and tested
8. Power to run the electronic dash
Done!
Need to build power supply, my just put on better connector on current system.
9. Clean up wires into conduit
Done!
May do some more, but pretty much there.
10. Cover powdered bus bar
Done!
Can always use more electrical tape though
11. Replace ground terminal from battery to loop end.
Done!
Tape is great
12. Relocate Rear Brake light to directly behind driver.
Done!
13. Investigate ECU control of idle
Done!
Tried a number of things, but have adjusted idle and works fine once car is warmed up.
14. Run car with computer connected to consult monitoring systems
ECU and ConZult having difficulties hooking up
15. Replace coil #3 plug from old wiring harness
Done!
Just needed the extra weather seal removed
16. Shorten Starter and Alternator control lines.
Done!
Mechanical Systems
Items
Status
Comments
1. Engine compress test
Done
1- 190, 2 -180, 3- 190, 4-175, 5-200, 6-180
2. Vacuum test
Done
900 rpm 51 inHg
3. Test water temperature sensor
Done
4. Test fuel level sensor
Done
5. Install exhaust system
Done
Front installed and parts acquired.
6. Install front bumper
Done
7. Inspect brakes and Bleed
Rear Brakes are low and should be replaced after practice and before race
8. Remove dust covers from Brakes
Done
Thanks Tony and Rod
9. Front alignment
10. Test clutch
Done
11. Check water level
Done
12. Change oil
Have the oil
13. Install hood
Done
14. Install front adjustable sway bar
Done
15. Install rear driver adjustable sway bar
Parts ordered
16. Install front strut tower support
Done
New nut for the two mounting bolts
17. Check strut and tighten
Done
Pit and Logistics Systems
Items
Status
Comments
1. Hotel room confirmation and number of rooms confirmed
Last checks
2. Reserve tow truck
Done
San Ramon U-Haul
3. Reserve trailer
4. RV
Done
Done
Tracy Travlin Toy's
El Monte Dublin
5. T-shirt printing
Design finished
6. Beanies for drivers
Done
7. Menu
Done
Outlines started
8. Water cooler for fifth driver
Done
9. Residual value memo to Jay
Memo posted and sent to Jay
10. Fuel tank system
Done

11. Test refueling system
Done
Test run dropped 10 gallons into the car in 42 seconds.
12. Pack for the track
13. BS Binder
Half the totes packed

14. Replace team logo on Hood
Logo Completed
15. Refresh paint
Hood Done spot on body

Safety
Items
Status
Comments
1. New neck brace
Done
Ordered
2. Roll Bar check for crakes and bolt tightness
Done
3. Electrical wire tie down and ECU cover
Done

4. Review rules and generate safety checklist

Final Check
5. K-Bar
Done