Wednesday, November 25, 2015

Plead For Residual Value (Arse-Freeze 2015)

Judge Phil,

Lemons HQ in some fit of madness has accepted us, Half Life Racing Ra-D-um and Seize-Z-um in Arse Freeze Appaloosa.  We last ran our two cars at "Vodden the Hell are we Doing?" and we are still rebalancing our electrolytes and dusting ourselves off from the race in Thunderhill. 

In the beginning of that race, we had a tough start.  We found the rear bearing on the Z to be more worn than first thought on the departure day, so we had a lot of unexpected work to get ready.

When we got on to the track there was more work to be done that prevent us from running.  The only solution was to find our inner zen.

Once acquired the cars found their way onto the track.


In the end we eat well,

and ran good enough for our standards.  We even managed to find someone to compete with.  Though it was only an inter squad battle.
As for the cars post race, outwardly they seems to have done well.  A tap on a fender to push it back out, some buffing to remove the tire mark, and some rattle can paint to cover everything else and the cars appear to be Lemons ready. 

However, kicking the tires a little harder we found bearing problems with the differential on the Miata, Suspension linkage and radiator troubles with the Z.

We've seen worse with these cars, but if left unattended they could get us into trouble at Arse Freeze.  So, to run these cars again we ask you for a fair residual value in the $440 range.  That will allow us to buy the bearings for the Miata and stock rubber to fashion a bushing.

Thank you for the consideration.  Please let me know if you have any questions.

Muddy

Tuesday, November 24, 2015

Weather for Arse Freeze

Well, this has changed a few times and being 10 days out there is plenty of opportunity for editing of the report.  However, as of now it is looking bright:


  • Fri

    Dec 4

    Sunshine54°Lo 40°
  • Sat

    Dec 5

    Sunshine60°Lo 40°
    more
  • Sun

    Dec 6

    Considerable cloudiness61°Lo 43°
    more

Hotel Reservation for Arse-Freeze 2015

I have made team's hotel reservation for Friday, December 4, at the Comfort Inn in Vallejo (address below). The Inn is different than the one we have been staying at.  It is on same street in Vallejo and is next to the Home Depot. We currently have 4 rooms, so in the comments section please let me know if you need a room with the number of bodies. 

Here is the reservation:

Comfort Inn®
Join Choice Privileges®. 
It's Free!

Like us on Facebook

RESERVATION CONFIRMATION
RESERVATION CONFIRMATION
Dear Muddy,

We're pleased to confirm your upcoming stay at the Comfort Inn, Vallejo, CA. Below is information about your stay to help you prepare for your trip.

See you soon!

Name: Muddy
Confirmation Number: 58366964
Reservation Status: Reserved
Check In: Friday, Dec 4, 2015 (3:00 PM)
Check Out: Sunday, Dec 6, 2015 (11:00 AM)
Number of Rooms: 4

View Reservation Details View Reservation Details

Please note: Please note that there is no elevator at this property.
Comfort Inn

Comfort Inn
1185 Admiral Callaghan Ln.,
Vallejo, CA, US, 94591
+1 (707) 648-1400


Make Another Reservation Make Another Reservation

Here is a Google map of the location:




Saturday, November 21, 2015

Work Checklist for 2015 Arse Freeze Alapolooza

With 14 days before the race here is the work left to be done.







Electrical Systems
Status



Items
300z

Type D
Comments

1
Power disconnect switch





2
Dashboard / Gages





3
Alternator light





4
Descuzzify wires





5
Main power battery hookups





6
Traqmate





7
Battery charged





8
Check charging system





9
Check ECU error codes





10
Switch for the cooling seat





11
Start button





12
Cooling fan





13
Idiot light system





14
ABS switch



Investigate







Engine and Driver train






Items
300z

Type D
Comments

1
Engine compress test
Done

Done
Z-  1-180, 2-180, 3-180, 4-180, 5-170, 6-170

D1-180,2-180, 3-160, 4-180

2
Spark plug
Done

Done


3
Replace oil filter


Done


4
Replace engine oil


Done


5
Add ZDDP



Z and D  2 oz

6
Check transmission oil
Done

Done


7
Check differential oil
Done


D- Replace

8
Check clutch fluid



D-Replace Master and Slave

9
Inspect timing belt





10
Inspect water and alt belt





11
Check air box


Done
Z - Install Cone Filter

12
Check and add water to radiator





13
Check and add water to overflow





14
Inspect throttle cable





15
Oil cooler and lines inspection





16
Run engine to temperature





17
Radiator





18
Radiator screen





19
Check Drive line












Suspension and Brakes






Items
300z

Type D
Comments

1
Check strut and tighten



Z- Upper link bushing

2
Inspection ball joint





3
Check wheel bearings



Z-Replace

4
Front Sway bar mount





5
Check rear and front bushing





6
Check rotors
Done

Done


7
Check brake pads
Done

Done
Z-change after practice

8
Bleed brake lines





9
Alignment



Z - 4° F camber

10
Tires and rims



Z – Need 1 Rim and inspect tires
D- Inspect tires

11
Check tire pressures



Z – 29 f 28 r D – 28 f/r

12
Strut tower support





13
Springs and Perch Inspection


Done


14
Break Bias
Done


D – Acquire and add

15
Check Wheel Studs


Done
Check and Possibly replace

16
Brake Cooling











Safety Systems






Items
300z

Type D
Comments

1
Check fire extinguisher





2
Fire suppression system



Install

3
Check seat





4
Check back rest





5
Check seat harness





6
Check mirrors



Order new mirror

7
Roll bar pad





8
Check tow hitch



Make sure they are labeled

9
Cover remaining glass





10
Secure roll cage





11
Arm restraints / driver net





12
Fire wall inspection





13
Battery disconnect outside





14
Main battery secured





15
Rear fire wall





16
Windshield
Done

Done


17
Fuel Vent line and system
Done

Done








Chassis






Items
300z

Type D
Comments

1
Wipers



Add Rain X t windows in and out

2
Front skirt


Done
Z – Repair new shirt

3
Rear diffuser



Design and install- might not happen

4
Rear spoiler
Done

Done


5
Door Latch Inspection





6
Door Panel Repair



Z – Passenger side door dent

7
Fender repair



Z – Front Right fender

8
Front and rear bumpers
Done

Done


9
Jack points





10
Check Frame Rails





Pit and Logistics Systems






Items
300z

Type D
Comments

1
Hotel room confirmation and number of rooms confirmed
Done

Done
5 Room at Comfort Inn

2
Reserve tow truck
Done

Done
Z - Daws Hammer
D - Pansy II- Sparky

3
Reserve trailer
Done

Done
Z Travel’yn Toys
D- U-Haul

4
RV rental
Done

Done
RV pending rental

5
T-shirt printing



Get Shirt to New Drivers

6
Team hats and jackets





7
Menu



In Process (Pizza likely)

8
Residual value memo to Marilee





9
Check radio harness





10
Ear buds for radio





11
Radio



Check radio number 3

12
Drivers Schedule





13
6x5-gallon carboy



Repair fill can and inspect others

14
Fuel storage
Done

Done
7x5 gallon

15
Pump
Done

Done


16
Inspect Pit Fire Extinguisher





17
Spare parts



Create inventory

18
Pack for the track





19
Test drive





20
Binder





21
Remove cooling seat











Décor






Items



Comments

1
Car number



Need 12 x 11x17 label

2
Team logo



Review

3
VLE logo



Inspect

4
Paint



Touch Up

5
Team Logo for Padlock



Print



(Key to colors:)

Green
Ready for track
Yellow
Have all parts needed just need to inspect and complete
Red
Need parts and/or plan