Saturday, November 21, 2015

Work Checklist for 2015 Arse Freeze Alapolooza

With 14 days before the race here is the work left to be done.







Electrical Systems
Status



Items
300z

Type D
Comments

1
Power disconnect switch





2
Dashboard / Gages





3
Alternator light





4
Descuzzify wires





5
Main power battery hookups





6
Traqmate





7
Battery charged





8
Check charging system





9
Check ECU error codes





10
Switch for the cooling seat





11
Start button





12
Cooling fan





13
Idiot light system





14
ABS switch



Investigate







Engine and Driver train






Items
300z

Type D
Comments

1
Engine compress test
Done

Done
Z-  1-180, 2-180, 3-180, 4-180, 5-170, 6-170

D1-180,2-180, 3-160, 4-180

2
Spark plug
Done

Done


3
Replace oil filter


Done


4
Replace engine oil


Done


5
Add ZDDP



Z and D  2 oz

6
Check transmission oil
Done

Done


7
Check differential oil
Done


D- Replace

8
Check clutch fluid



D-Replace Master and Slave

9
Inspect timing belt





10
Inspect water and alt belt





11
Check air box


Done
Z - Install Cone Filter

12
Check and add water to radiator





13
Check and add water to overflow





14
Inspect throttle cable





15
Oil cooler and lines inspection





16
Run engine to temperature





17
Radiator





18
Radiator screen





19
Check Drive line












Suspension and Brakes






Items
300z

Type D
Comments

1
Check strut and tighten



Z- Upper link bushing

2
Inspection ball joint





3
Check wheel bearings



Z-Replace

4
Front Sway bar mount





5
Check rear and front bushing





6
Check rotors
Done

Done


7
Check brake pads
Done

Done
Z-change after practice

8
Bleed brake lines





9
Alignment



Z - 4° F camber

10
Tires and rims



Z – Need 1 Rim and inspect tires
D- Inspect tires

11
Check tire pressures



Z – 29 f 28 r D – 28 f/r

12
Strut tower support





13
Springs and Perch Inspection


Done


14
Break Bias
Done


D – Acquire and add

15
Check Wheel Studs


Done
Check and Possibly replace

16
Brake Cooling











Safety Systems






Items
300z

Type D
Comments

1
Check fire extinguisher





2
Fire suppression system



Install

3
Check seat





4
Check back rest





5
Check seat harness





6
Check mirrors



Order new mirror

7
Roll bar pad





8
Check tow hitch



Make sure they are labeled

9
Cover remaining glass





10
Secure roll cage





11
Arm restraints / driver net





12
Fire wall inspection





13
Battery disconnect outside





14
Main battery secured





15
Rear fire wall





16
Windshield
Done

Done


17
Fuel Vent line and system
Done

Done








Chassis






Items
300z

Type D
Comments

1
Wipers



Add Rain X t windows in and out

2
Front skirt


Done
Z – Repair new shirt

3
Rear diffuser



Design and install- might not happen

4
Rear spoiler
Done

Done


5
Door Latch Inspection





6
Door Panel Repair



Z – Passenger side door dent

7
Fender repair



Z – Front Right fender

8
Front and rear bumpers
Done

Done


9
Jack points





10
Check Frame Rails





Pit and Logistics Systems






Items
300z

Type D
Comments

1
Hotel room confirmation and number of rooms confirmed
Done

Done
5 Room at Comfort Inn

2
Reserve tow truck
Done

Done
Z - Daws Hammer
D - Pansy II- Sparky

3
Reserve trailer
Done

Done
Z Travel’yn Toys
D- U-Haul

4
RV rental
Done

Done
RV pending rental

5
T-shirt printing



Get Shirt to New Drivers

6
Team hats and jackets





7
Menu



In Process (Pizza likely)

8
Residual value memo to Marilee





9
Check radio harness





10
Ear buds for radio





11
Radio



Check radio number 3

12
Drivers Schedule





13
6x5-gallon carboy



Repair fill can and inspect others

14
Fuel storage
Done

Done
7x5 gallon

15
Pump
Done

Done


16
Inspect Pit Fire Extinguisher





17
Spare parts



Create inventory

18
Pack for the track





19
Test drive





20
Binder





21
Remove cooling seat











Décor






Items



Comments

1
Car number



Need 12 x 11x17 label

2
Team logo



Review

3
VLE logo



Inspect

4
Paint



Touch Up

5
Team Logo for Padlock



Print



(Key to colors:)

Green
Ready for track
Yellow
Have all parts needed just need to inspect and complete
Red
Need parts and/or plan

No comments: