Monday, September 26, 2011

Work LIst For Shankaway 2011



Here is the task that I know to get us ready for the October Race. It looks like lot, but there are really only four items that will take a lot of time:
a) Roll Cage
b) Conversion to Type-D
c) Electrical setup
d) Always fun task of seat installation

Here is the list:

2011 Shankaway

Electrical Systems

Status

Items

Type D

300Z

Comments

1

Power Disconnect switch

Done

D-Install and cover

2

Dashboard

Done

D-Been ordered

3

Ignition switch

Done

D-Been ordered

4

Start button installed

Done

5

Install Wiper Switch

Done

6

Descuzzify wire/Light Wiring

Clean up wiring complete grounding tie done wires

7

Battery Tie Down

Done

8

Clock in the car

Done

9

Connect ECU to computer

10

Look for error messages

11

ECU Tune

12

Run car with computer connected to consult monitoring systems

13

Test Oxygen Sensor

Engine and Driver Train

Items

Comments

1

Engine compress test

Done

Z: 1- 185, 2 -180, 3- 180, 4-180, 5-180, 6-180

2

Replace oil filter

Filters in hand

3

Replace oil

D-Need oil

4

Check transmission oil

Have Gear Oil

5

Check Differential Oil

Have Gear Oil

6

Value Cover vent

Done

D- Need to get and drink pint of Foster's

7

Replace Radiator Hoses

D-Have Hose

8

Replace Heater Hose

D-Need Hose

9

Spark Plug

D-Have Plugs

10

Inspect Timing Belt

D-Have Belt

11

Inspect Water and Alt Belt

D & Z-Have Belt

12

Review Air Box

Done

13

Remove Catalytic Converter

14

Add Water to Radiator

15

Radiator Screen

Done

Suspension and Brakes

Items

Comments

1

Check strut and tighten

Strut ordered

2

Replace Ball Joint

Done

Order

3

Check Wheel bearings

Done

Done

Have parts

4

Repair Front Sway bar mount

Have parts

5

Replace rotors

Done

Fronts needed

6

Replace Brake Pads

Done

Z- HP Hawk pads

7

Bleed lines

8

Alignment

9

Tires

D- 2 sets ordered Z- 2 sets order

10

Rims

D- 2 sets ordered Z- 2 needs to be ordered

Safety Systems

Items

Comments

1

Install Fire Extinguisher

Done

order extinguisher

2

Install and Check Seat

order backrest / check bolts

3

Install and Check Back Rest

Done

ordered back rest

4

Install Seat Harness

order seat harness

5

Install Mirror

order Mirror

6

Roll Bar Pad

Order pads

7

Install Tow Hitch

D-Ordered Hitch / D &Z Mark Hitch

8

Cover Remaining Glass

Done

9

Secure Roll Cage

D-Install / Check Bolts

10

Arm Restraints / Driver Net

On Order

Pit and Logistics Systems

Items

Comments

1

Hotel room confirmation and number of rooms confirmed

Done

Done

5 Room at Best Western Inn (two rooms taken)

2

Reserve tow truck

Done

Done

Daws

3

Reserve trailer

4

RV rental

Done

Done

RV pending rental

5

T-shirt printing

6

Team Hats and jackets

7

Menu

8

Residual value memo to Jay

Done

9

Mount radio wiring harness to seatbelt

In Each Car

10

Ear Buds for radio

Done

order 1 more

11

Radio

7 Radios

12

Pit Board

Started

13

Drivers Schedule

14

5x5-gallon carboy

Review

15

Fuel Storage

Done

Done

55 gallon + 5x5 gallon

16

Pump

been order

17

Spare Parts

18

Pack for the track

19

Test drive

20

Binder

Start D & edit Z's Binder

Décor

Items

Comments

1

Car Number

Done

Have 11x17 label

2

Team Logo

Review

3

VLE Logo

Done

Have 11x17 label

4

Front Fenders

N/A

5

Rear Fin

N/A

6

Paint

Need check Paint

Dash to be added