Friday, July 18, 2014

It just might happen that Whitey runs in the Vodden Race

I just received word from Sparky of his progress. Last I left him and Whitey in late June, the wiring harness was spilling out of the car like guts, and all had concerns look as the car would not start because of a ground wire in the ignition was sporadically working. Also, facing us was the tedious work to identify each of the wires to activate or deactivate the car's various functions. I think the sporadic element was too much, but whatever the case, Sparky has decided to rewire a good portion of Whitey. This task is not taken lightly for it too is a lot of work and requires great skill to accomplish. So, forgive me that there was some doubt (more because of the time, and only Sparky has the skills) that there is a plan B in mind. (Rubie like a Phoenix can rise again in three week.  It would take some " unique " fixes, and no guaranties that we will be point straight, but something will run.)

However, since that glumly June, we have seen many events.  The first being the main wiring harness coming out. (See,  a previous post with Torch proudly weighing the end trails.) Various e-mails about plans, cars systems added to the plans, and parts arriving all greatly increased the hope. Then today comes additional good news. A photo of life in the control panel and switches as the new wiring harness is bench (really card table) tested.


This is a big milestone, so many kudos to Sparky for his hard work to get to this point. We still need to get it all in, and test it, but hey one step at a time.

As for other items, work on both cars are planned for this weekend. I plan to visit Torch on Sunday to continue to reduce those pesky punch list items, so more on that later this weekend.

Monday, July 14, 2014

July Work List for Vodden the Hell

A lot of work has been done up to this point, but there is still a fair amount left to get us ready for September.  Here is the work list that I know of at this point.


Work List for 2014 Thunderhill Vodden the Hell









Electrical Systems
Status



Items
300z

Type D
Comments

1
Power disconnect switch



Need Box and Install

2
Dashboard / Gages



Z-Install dash, clock, volt/ D-check

3
Alternator light





4
Descuzzify wires



Rewire Z

5
Cyclopes and rear lights





6
Main power battery hookups



Install

7
Install Traqmate/Wifi Lapper



D- Figure Samsung power

8
Battery charged





9
Check charging system





10
Check ECU error codes





11
Off switch for the cooling seat



Install

12
Start button



Install

13
Fan switch



Install

14
Idiot light system



Z- Install / D- Cover light – lower high temp

15
ABS switch



Install







Engine and Driver train






Items
300z

Type D
Comments

1
Engine compress test
Done

Done
Z: 1- 180, 2 -170, 3- 180, 4-180, 5-180, 6-170  

D1-185,2-185, 3-185, 4-180

2
Spark plug


Done


3
Replace oil filter





4
Replace engine oil



Need 16 quarts for the race

5
Check transmission oil



Need shifter bushing

6
Check differential oil



Need 2 gallons for gear oil the race

7
Check clutch fluid





8
Inspect timing belt





9
Inspect water and alt belt





10
Check air box



Z design / D nstall

11
Check and add water to radiator



Install

12
Check and add water to overflow



Install

13
Cooling fan



Install fan switch

14
Inspect and replace throttle cable





15
Oil cooler and lines inspection



Install

16
Run engine to temperature





17
Test rear differential



D- Review

18
Fuel cooling plan



Not Happening

19
Radiator screen











Suspension and Brakes






Items
300z

Type D
Comments

1
Check strut and tighten





2
Inspection ball joint





3
Check wheel bearings





4
Front Sway bar mount





5
Check rear and front bushing





6
Check rotors



Acquire rotors for Z

7
Check brake pads



Acquire brake pads Z

8
Bleed brake lines





9
Check bias





10
Alignment





11
Tires and rims



Z 1-rim – 8 tires / D – 2 tires

12
Check tire pressures





13
Strut tower support











Safety Systems






Items
300z

Type D
Comments

1
Check fire extinguisher



Install in Z

2
Fire suppression system



Install

3
Check seat





4
Check back rest





5
Check seat harness





6
Check mirrors



Have Z mirror

7
Roll bar pad



Install in the Z

8
Check tow hitch



Find Z Tow Hitch

9
Cover remaining glass





10
Secure roll cage





11
Arm restraints / driver net





12
Fire wall inspection





13
Battery disconnect outside





14
Main battery secured



Need battery box for Z

15
Rear fire wall











Chassis






Items
300z

Type D
Comments

1
Wipers





2
Front skirt



Need to order

3
Rear diffuser



Design and install

4
Rear spoiler



Install Z

5
Fender repair



Fix D

6
Front and rear bumpers



Fix D

7
Jack points






Pit and Logistics Systems






Items
300z

Type D
Comments

1
Hotel room confirmation and number of rooms confirmed
Done

Done
5 Room at Baymount Inn

2
Reserve tow truck
Done


Daws / Need a second

3
Reserve trailer


Done
Pending Contact from Tarvlyn Toys

4
RV rental
Done

Done
RV pending rental

5
T-shirt printing





6
Team hats and jackets





7
Menu



In Process (Pizza likely)

8
Residual value memo to Jay





9
Check radio harness



Z install and check

10
Ear buds for radio





11
Radio
Done

Done
7 Radios

12
Drivers Schedule





13
5x5-gallon carboy



Need to setup 3 carboys

14
Fuel storage



55 gallon + 5x5 gallon

15
Pump





16
Spare parts



Create inventory

17
Pack for the track





18
Test drive





19
Binder



Start Z & edit D's binder

20
Install seat cooler and test



Need hose







Décor






Items



Comments

1
Car number



Need 11x17 label

2
Team logo



Review

3
VLE logo



Have 11x17 label

4
Paint



Design Themes



 (Key to colors:

Green
Ready for track
Yellow
Have all parts needed just to inspect and complete
Red
Need parts and/or plan


Current State of the 300z wires...