A lot of work has been done up to this point, but there is still a fair amount left to get us ready for September. Here is the work list that I know of at this point.
Work List for 2014
Thunderhill Vodden the Hell
|
Electrical Systems
|
Status
|
|||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Power disconnect switch
|
Need Box and Install
|
||||
2
|
Dashboard / Gages
|
Z-Install dash, clock, volt/
D-check
|
||||
3
|
Alternator light
|
|||||
4
|
Descuzzify wires
|
Rewire Z
|
||||
5
|
Cyclopes and rear lights
|
|||||
6
|
Main power battery hookups
|
Install
|
||||
7
|
Install Traqmate/Wifi Lapper
|
D- Figure Samsung power
|
||||
8
|
Battery charged
|
|||||
9
|
Check charging system
|
|||||
10
|
Check ECU error codes
|
|||||
11
|
Off switch for the cooling seat
|
Install
|
||||
12
|
Start button
|
Install
|
||||
13
|
Fan switch
|
Install
|
||||
14
|
Idiot light system
|
Z- Install / D- Cover light –
lower high temp
|
||||
15
|
ABS switch
|
Install
|
||||
Engine and Driver train
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Engine compress test
|
Done
|
Done
|
Z: 1- 180, 2 -170, 3- 180,
4-180, 5-180, 6-170
D1-185,2-185, 3-185, 4-180
|
||
2
|
Spark plug
|
Done
|
||||
3
|
Replace oil filter
|
|||||
4
|
Replace engine oil
|
Need 16 quarts for the race
|
||||
5
|
Check transmission oil
|
Need shifter bushing
|
||||
6
|
Check differential oil
|
Need 2 gallons for gear oil the race
|
||||
7
|
Check clutch fluid
|
|||||
8
|
Inspect timing belt
|
|||||
9
|
Inspect water and alt belt
|
|||||
10
|
Check air box
|
Z design / D nstall
|
||||
11
|
Check and add water to radiator
|
Install
|
||||
12
|
Check and add water to overflow
|
Install
|
||||
13
|
Cooling fan
|
Install fan switch
|
||||
14
|
Inspect and replace throttle
cable
|
|||||
15
|
Oil cooler and lines inspection
|
Install
|
||||
16
|
Run engine to temperature
|
|||||
17
|
Test rear differential
|
D- Review
|
||||
18
|
Fuel cooling plan
|
Not Happening
|
||||
19
|
Radiator screen
|
|||||
Suspension and Brakes
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Check strut and tighten
|
|||||
2
|
Inspection ball joint
|
|||||
3
|
Check wheel bearings
|
|||||
4
|
Front Sway bar mount
|
|||||
5
|
Check rear and front bushing
|
|||||
6
|
Check rotors
|
Acquire rotors for Z
|
||||
7
|
Check brake pads
|
Acquire brake pads Z
|
||||
8
|
Bleed brake lines
|
|||||
9
|
Check bias
|
|||||
10
|
Alignment
|
|||||
11
|
Tires and rims
|
Z 1-rim – 8 tires / D – 2 tires
|
||||
12
|
Check tire pressures
|
|||||
13
|
Strut tower support
|
|||||
Safety Systems
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Check fire extinguisher
|
Install in Z
|
||||
2
|
Fire suppression system
|
Install
|
||||
3
|
Check seat
|
|||||
4
|
Check back rest
|
|||||
5
|
Check seat harness
|
|||||
6
|
Check mirrors
|
Have Z mirror
|
||||
7
|
Roll bar pad
|
Install in the Z
|
||||
8
|
Check tow hitch
|
Find Z Tow Hitch
|
||||
9
|
Cover remaining glass
|
|||||
10
|
Secure roll cage
|
|||||
11
|
Arm restraints / driver net
|
|||||
12
|
Fire wall inspection
|
|||||
13
|
Battery disconnect outside
|
|||||
14
|
Main battery secured
|
Need battery box for Z
|
||||
15
|
Rear fire wall
|
|||||
Chassis
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Wipers
|
|||||
2
|
Front skirt
|
Need to order
|
||||
3
|
Rear diffuser
|
Design and install
|
||||
4
|
Rear spoiler
|
Install Z
|
||||
5
|
Fender repair
|
Fix D
|
||||
6
|
Front and rear bumpers
|
Fix D
|
||||
7
|
Jack points
|
Pit and Logistics Systems
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Hotel room confirmation and
number of rooms confirmed
|
Done
|
Done
|
5 Room at Baymount Inn
|
||
2
|
Reserve tow truck
|
Done
|
Daws / Need a second
|
|||
3
|
Reserve trailer
|
Done
|
Pending Contact from Tarvlyn
Toys
|
|||
4
|
RV rental
|
Done
|
Done
|
RV pending rental
|
||
5
|
T-shirt printing
|
|||||
6
|
Team hats and jackets
|
|||||
7
|
Menu
|
In Process (Pizza likely)
|
||||
8
|
Residual value memo to Jay
|
|||||
9
|
Check radio harness
|
Z install and check
|
||||
10
|
Ear buds for radio
|
|||||
11
|
Radio
|
Done
|
Done
|
7 Radios
|
||
12
|
Drivers Schedule
|
|||||
13
|
5x5-gallon carboy
|
Need to setup 3 carboys
|
||||
14
|
Fuel storage
|
55 gallon + 5x5 gallon
|
||||
15
|
Pump
|
|||||
16
|
Spare parts
|
Create inventory
|
||||
17
|
Pack for the track
|
|||||
18
|
Test drive
|
|||||
19
|
Binder
|
Start Z & edit D's binder
|
||||
20
|
Install seat cooler and test
|
Need hose
|
||||
Décor
|
||||||
Items
|
Comments
|
|||||
1
|
Car number
|
Need 11x17 label
|
||||
2
|
Team logo
|
Review
|
||||
3
|
VLE logo
|
Have 11x17 label
|
||||
4
|
Paint
|
Design
Themes
|
(Key to colors:
Green
|
Ready for track
|
Yellow
|
Have all parts needed just to inspect and complete
|
Red
|
Need parts and/or plan
|
Current State of the 300z wires...
I would say the full 300z electrical list is RED at this point as the harness is spread out at home instead of in the car...
ReplyDelete