As we have chronicled the team has been very busy over the winter. With great relief, we have a motor that appears to run for the Z. Now with 14 days left, focus of the work will be on fine-tuning the cars and assemble all the items needed to run.
Here is the active working list to get us ready.
2013 Sears Pointless
|
|
|
|
|
||
|
|
|
|
|
|
|
Electrical Systems
|
Status
|
|
||||
|
|
Items
|
300z
|
|
Type D
|
Comments
|
|
1
|
Power Disconnect switch
|
|
|
|
Z-reconnect and test both
|
|
2
|
Dashboard
|
|
|
Done
|
|
|
3
|
Alternator Light
|
|
|
Done
|
|
|
4
|
Descuzzify wires
|
|
|
|
|
|
5
|
Battery Box
|
|
|
Done
|
|
|
6
|
Cyclopes real Light
|
|
|
|
Confirm operation
|
|
7
|
Tack reinstall
|
|
|
Done
|
Check the tack
|
|
8
|
Main Power Battery Hookups
|
|
|
|
Recrip the Z
|
|
9
|
Install Traqmate/WifiLapper
|
|
|
|
D- Get power and car holder
|
|
10
|
Battery Charged
|
|
|
|
|
|
11
|
Check charging system
|
|
|
|
|
|
12
|
Check ECU Error codes
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Engine and Driver Train
|
Status
|
|
||||
|
|
Items
|
300z
|
|
Type D
|
Comments
|
|
1
|
Engine compress test
|
Done
|
|
Done
|
Z: 1- 170, 2 -190, 3- 170, 4-
160, 5- 190, 6- 160
D1-170,2-180, 3-180, 4-180
|
|
2
|
Spark Plug
|
Done
|
|
Done
|
|
|
3
|
Replace oil filter
|
|
|
Done
|
Filters in hand
|
|
4
|
Replace oil
|
|
|
Done
|
Drain Plug
|
|
5
|
Check transmission oil
|
Done
|
|
Done
|
|
|
6
|
Check Differential Oil
|
Done
|
|
Done
|
Have Gear Oil
|
|
7
|
Check Clutch Fluid
|
|
|
|
|
|
8
|
Inspect Timing Belt
|
Done
|
|
Done
|
D-Have Plugs
|
|
9
|
Inspect Water and Alt Belt
|
|
|
|
D-Have Belt
|
|
10
|
Air Box
|
Done
|
|
|
|
|
11
|
Check and add Water to Radiator
|
|
|
Done
|
Z Relocate overflow container
|
|
12
|
Inspect and replace throttle
Cable
|
|
|
|
|
|
13
|
Wipers
|
|
|
|
|
|
14
|
Run engine to temperature
|
|
|
|
|
|
15
|
Test Drive
|
|
|
|
|
|
16
|
Install Oil Cooler
|
|
|
Done
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Suspension and Brakes
|
Status
|
|
||||
|
|
Items
|
300z
|
|
Type D
|
Comments
|
|
1
|
Check strut and tighten
|
|
|
|
Strut
ordered for D
|
|
2
|
Inspection Ball Joint
|
|
|
|
Order
|
|
3
|
Check Wheel bearings
|
|
|
|
Have parts
|
|
4
|
Front Sway bar mount
|
|
|
|
Z- Reconnect from sway bay, D-
check
|
|
5
|
Check rear and front bushing
|
|
|
|
|
|
6
|
Check Front Tie Rods
|
Done
|
|
Done
|
|
|
7
|
Replace rotors
|
Done
|
|
|
Check D System
|
|
8
|
Check Brake Pads
|
Done
|
|
|
Z- HP Hawk pads
|
|
9
|
Bleed brake lines
|
|
|
|
|
|
10
|
Check bias
|
|
|
|
|
|
11
|
Alignment
|
|
|
|
|
|
12
|
Tires and Rims
|
|
|
|
|
|
13
|
Check Tire Pressures
|
|
|
|
|
|
14
|
Strut Tower Support
|
|
|
|
Reinstall Z
|
|
|
|
|
|
|
|
Safety Systems
|
Status
|
|
||||
|
|
Items
|
300z
|
|
Type D
|
Comments
|
|
1
|
Install Fire Extinguisher
|
Done
|
|
Done
|
order extinguisher
|
|
2
|
Install and Check Seat
|
|
|
|
|
|
3
|
Install and Check Back Rest
|
|
|
|
|
|
4
|
Inspect Seat Harness
|
|
|
|
|
|
5
|
Inspect Mirror
|
|
|
|
|
|
6
|
Roll Bar Pad
|
|
|
|
|
|
7
|
Check Tow Hitch
|
|
|
|
Label
|
|
8
|
Check Remaining Glass
|
|
|
|
|
|
9
|
Secure Roll Cage
|
|
|
|
|
|
10
|
Arm Restraints / Driver Net
|
|
|
|
On Order
|
|
11
|
Fire Wall Inspection
|
|
|
|
|
|
12
|
Battery Manual Disconnect
|
|
|
|
|
|
13
|
Rear Fire wall
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other
|
Status
|
|
||||
|
|
Items
|
300z
|
|
Type D
|
Comments
|
|
1
|
Hood
|
|
|
Done
|
|
|
2
|
Paint
|
|
|
|
Paint
|
|
3
|
Décor
|
|
|
|
Labels
|
|
4
|
Defuser
|
|
|
|
Inspect
and Repair
|
|
5
|
Vacuum out cars
|
|
|
|
|
|
6
|
Fuel Vent check value
|
|
|
Done
|
Install
New check value
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
No comments:
Post a Comment