Friday, March 17, 2017

Final Weekend Work Checklist for Sears Pointless

A lot of hard work has gone in to getting the cars and Daws close for the upcoming stress test.  With a week to go we are close.

One item that has been bedeviling (me specifically) is the balance of the D.  The events of the past four races have simply destroyed the D.  In a previous blog I went into detail of what mess we have and how we worked to "fixed it".  Under static look it appears fine, however, on simulated driver load (which is 2 x 350Z rotors, a lose car battery, a tote of brake parts, 6 x five quarts  jugs of oil, a gallon of water, and spare alternate = 190 lbs ) the corner weighs go to hell.  The left rear out weights the front right and the left front is 2/3 the weight of the entire left side.

So, after days of fiddling, by adjusting ride heights with various blocks under wheel while the car is on the scales (Thank you Torch for the ideal), I have developed a "theoretically" fix.  Now this weekend I need to apply these "fixes" and set the final height.  How can this go wrong?

In addition to the balance here is the rest of the items that need to be completed:

Work Checklist for Sears Pointless 2017







Electrical Systems
Status



Items
300z

Type D
Comments

1
Power disconnect switch
Done

Done
Test

2
Dashboard / Gages
Done

Done


3
Alternator light
Done

Done


4
Descuzzify wires
Done

Done


5
Main power battery hookups
Done

Done


6
Traqmate



Check D

7
Battery charged
Done

Done


8
Check charging system
Done

Done


9
Check ECU error codes
Done

Done


10
Switch for the cooling seat
Done

Done
Not Needed

11
Start button
Done

Done


12
Cooling fan



D and Z- Mount thermocouple

13
Idiot light system
Done

Done


14
Racer Connect System - Car



Camera Setup

15
Racer Connect System - Pit



Jackspot setup – Laptop - Monitor







Engine and Drivetrain






Items
300z

Type D
Comments

1
Engine compress test
Done

Done
Z-  1-170, 2-170, 3-170-, 4-170,   5-170, 6-160

D1-175, 2-180, 3-180, 4-180

2
Spark plug
Done

Done


3
Replace oil filter
Done

Done
D - Install new filter housing

4
Replace engine oil
Done

Done
Need 18 quarts for the race

5
Check transmission oil
Done

Done


6
Check differential oil
Done

Done


7
Check clutch fluid





8
Inspect timing belt
Done

Done


9
Inspect water and alt belt





10
Check air box
Done

Done


11
Check and add water to radiator





12
Check and add water to overflow





13
Inspect throttle cable





14
Oil cooler and lines inspection
Done


D- Need Replacement

15
Run engine to temperature
Done

Done


16
Radiator
Done

Done



17
Radiator screen
Done

Done










Suspension and Brakes






Items
300z

Type D
Comments

1
Check strut and tighten





2
Inspection ball joint





3
Check wheel bearings





4
Front and rear sway bar mount
Done




5
Check rear and front bushing





6
Check rotors
Done

Done


7
Check brake pads
Done

Done


8
Bleed brake lines





9
Alignment





10
Tires and rims



Have tire need to mount

11
Check tire pressures



Z – 29 f 28 r D – 28 f/r

12
Strut tower support





13
Springs and Perch Inspection





14
Brake Bias
Done

Done
D – Acquire and add

15
Brake Cooling
Done










Safety Systems






Items
300z

Type D
Comments

1
Check fire extinguisher
Done

Done


2
Fire suppression system
Done




3
Check seat
Done

Done


4
Check back rest
Done

Done


5
Check seat harness
Done

Done


6
Check mirrors
Done

Done


7
Roll bar pad
Done

Done


8
Check tow hitch



Make sure they are labeled

9
Cover remaining glass
Done

Done


10
Secure roll cage
Done

Done


11
Arm restraints / driver net
Done

Done


12
Fire wall inspection





13
Battery disconnect outside
Done

Done


14
Main battery secured
Done

Done


15
Rear fire wall





16
Windshield
Done

Done


17
Fuel system and vent line
Done

Done








Chassis






Items
300z

Type D
Comments

1
Wipers





2
Front skirt





3
Rear diffuser
Done




4
Rear spoiler
Done