Monday, September 1, 2014

Work Continues in Prep for Vodden

We had a busy productive workday Sunday.  With a full contingent of Lugnut, Queen, Torch, Tow and Tow Jr, we were able to get a lot of items completed.  The D is near completed, the Z not so much.

Here is the list:


Work List for 2014 Thunderhill Vodden the Hell







Electrical Systems
Status



Items
300z

Type D
Comments

1
Power disconnect switch
Done

Done
Need Box and Install

2
Dashboard / Gages
Done

Done


3
Alternator light
Done

Done


4
Descuzzify wires


Done
Rewire Z

5
Main power battery hookups
Done

Done
Install

6
Install Traqmate/Wifi Lapper
Done


D- Figure Samsung power

7
Battery charged





8
Check charging system
Done

Done


9
Check ECU error codes
Done

Done


10
Off switch for the cooling seat



Install

11
Start button
Done

Done
Install

12
Fan switch
Done


Install

13
Idiot light system


Done
Z- Install / D- Cover light – lower high temp

14
ABS switch



Install







Engine and Driver train






Items
300z

Type D
Comments

1
Engine compress test
Done

Done
Z- Not Good

D1-185,2-185, 3-185, 4-180

2
Spark plug
Done

Done


3
Replace oil filter


Done


4
Replace engine oil


Done
Need 16 quarts for the race

5
Check transmission oil
Done

Done
Need shifter bushing

6
Check differential oil
Done

Done
Need 2 gallons for gear oil the race

7
Check clutch fluid
Done

Done


8
Inspect timing belt
Done

Done


9
Inspect water and alt belt
Done

Done
Replace Z

10
Check air box
Done

Done
Z design / D nstall

11
Check and add water to radiator
Done

Done
Install

12
Check and add water to overflow
Done

Done
Install

13
Cooling fan
Done

Done
Install fan switch

14
Inspect and replace throttle cable
Done

Done


15
Oil cooler and lines inspection



Install

16
Run engine to temperature
Done




17
Test rear differential
Done

Done
D- Review

18
Radiator screen
Done

Done


19
Shifter bushing
Done










Suspension and Brakes






Items
300z

Type D
Comments

1
Check strut and tighten
Done

Done


2
Inspection ball joint
Done

Done


3
Check wheel bearings
Done

Done


4
Front Sway bar mount
Done

Done


5
Check rear and front bushing
Done

Done


6
Check rotors


Done
Acquire rotors for Z

7
Check brake pads


Done
Acquire brake pads Z

8
Bleed brake lines





9
Check bias





10
Alignment





11
Tires and rims



Z 1-rim – 8 tires / D – 2 tires

12
Check tire pressures





13
Strut tower support


Done


14
Brake Cooling











Safety Systems






Items
300z

Type D
Comments

1
Check fire extinguisher
Done

Done
Install in Z

2
Fire suppression system



Install

3
Check seat
Done

Done


4
Check back rest


Done


5
Check seat harness
Done

Done


6
Check mirrors
Done

Done
Have Z mirror

7
Roll bar pad
Done

Done


8
Check tow hitch



Find Z Tow Hitch

9
Cover remaining glass
Done

Done


10
Secure roll cage
Done

Done


11
Arm restraints / driver net





12
Fire wall inspection
Done

Done


13
Battery disconnect outside


Done
Label the Z switch

14
Main battery secured
Done

Done
Need battery box for Z

15
Rear fire wall
Done

Done


16
Windshield











Chassis






Items
300z

Type D
Comments

1
Wipers


Done
Most likely not needed.

2
Front skirt



Need to install

3
Rear diffuser



Design and install- not

4
Rear spoiler
Done

Done
Install Z

5
Fender repair
Done

Done
Fix D

6
Front and rear bumpers
Done

Done
Fix D

7
Jack points
Done

Done



Pit and Logistics Systems






Items
300z

Type D
Comments

1
Hotel room confirmation and number of rooms confirmed
Done

Done
5 Room at Baymount Inn

2
Reserve tow truck
Done


Daws / Need a second

3
Reserve trailer
Done

Done
Pending Contact from Tarvlyn Toys

4
RV rental
Done

Done
RV pending rental

5
T-shirt printing





6
Team hats and jackets





7
Menu



In Process (Pizza likely)

8
Residual value memo to Jay





9
Check radio harness



Z install and check

10
Ear buds for radio





11
Radio
Done

Done
7 Radios

12
Drivers Schedule





13
5x5-gallon carboy
Done

Done
Need to setup 3 carboys

14
Fuel storage
Done

Done
55 gallon + 5x5 gallon

15
Pump
Done

Done


16
Spare parts
Done

Done
Create inventory

17
Pack for the track





18
Test drive





19
Binder



Start Z & edit D's binder

20
Install seat cooler and test



Need hose







Décor






Items



Comments

1
Car number



Need 11x17 label

2
Team logo



Review

3
VLE logo



Have 11x17 label

4
Paint



Design Themes

(Key to colors:
Green
Ready for track
Yellow
Have all parts needed just to inspect and complete
Red
Need parts and/or plan

No comments:

Post a Comment