Sunday, Lugnut, Torch, and I worked many of the items off the punch list. The D got some love and is nearly race ready. The D really needs a little lipstick and should be good to go. The Z also saw some visible improvements. So much in fact, here is the picture as of Sunday night when I said,"Enough" and closed down for night.
It looks closer than it is, but it is taking shape nicely. With one more weekend I think we can say, "are work here should be done".
For the gritty detail here is the official punch list:
Work
Checklist for 2017 Arse-Freeze Alapolooza
|
||||||
Electrical
Systems
|
Status
|
|||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Power
disconnect switch
|
Done
|
Done
|
|||
2
|
Dashboard
/ Gages
|
Done
|
Install
Fuel, Oil, Water, and Tack
|
|||
3
|
Alternator
light
|
Done
|
Check
|
|||
4
|
Descuzzify
wires
|
Done
|
Bundle
loose wires
|
|||
5
|
Main
power battery hookups
|
Done
|
Shorten
lines
|
|||
6
|
Traqmate
|
Check
|
||||
7
|
Battery
charged
|
Test
|
||||
8
|
Check
charging system
|
|||||
9
|
Check
ECU error codes
|
|||||
10
|
Check Bus bar on
fire wall
|
Final
check
|
||||
11
|
Cooling seat
system
|
Done
|
Done
|
|||
12
|
Start button
|
Done
|
Done
|
|||
13
|
Cooling
fan
|
Done
|
||||
14
|
Idiot light system
|
Done
|
Calibrate
|
|||
15
|
Racer Connect
System - Car
|
Camera
Setup and change power
|
||||
16
|
Racer Connect
System - Pit
|
Done
|
Laptop
- Monitor
|
|||
17
|
Crankshaft
Position Sensor
|
Need
Female connector
|
||||
Engine
and Drivetrain
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Engine
compress test
|
Done
|
Done
|
Z- 1-
170, 2- 170, 3- 180, 4- 170, 5- 180 , 6- 170
D1- 160,2-
150, 3- 145, 4- 150
|
||
2
|
Spark plug
|
Done
|
Done
|
|||
3
|
Replace
oil filter
|
Done
|
Run
engine to temp and change
|
|||
4
|
Replace
engine oil
|
Done
|
Run
engine to temp and change
|
|||
5
|
Check transmission
oil
|
Done
|
Done
|
|||
6
|
Check differential
oil
|
Done
|
Done
|
|||
7
|
Check clutch fluid
|
Done
|
Done
|
|||
8
|
Inspect timing
belt
|
Done
|
Done
|
|||
9
|
Inspect
water and alt belt
|
Done
|
||||
10
|
Check
air box
|
Done
|
Add
additional support
|
|||
11
|
Check
and add water to radiator
|
Done
|
||||
12
|
Check
and add water to overflow
|
Done
|
Install
overflow can
|
|||
13
|
Inspect
throttle cable
|
Done
|
Repair
throttle body connector
|
|||
14
|
Oil cooler and lines inspection
|
Done
|
Install
catch can system
|
|||
15
|
Run engine to temperature
|
|||||
16
|
Radiator
|
Done
|
Done
|
|||
17
|
Radiator screen
|
Done
|
Done
|
|||
18
|
Fuel Pump
|
Done
|
Done
|
Suspension
and Brakes
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Check
strut and tighten
|
Done
|
||||
2
|
Inspection
ball joint
|
Done
|
Done
|
|||
3
|
Check
wheel bearings
|
Done
|
Done
|
|||
4
|
Front and
rear sway bar mount
|
Done
|
Add
extension of mounting point
|
|||
5
|
Check
rear and front bushing
|
Done
|
Done
|
|||
6
|
Check
rotors
|
Done
|
Done
|
|||
7
|
Check
brake pads
|
Done
|
Done
|
|||
8
|
Bleed
brake lines
|
Done
|
Done
|
|||
9
|
Alignment
|
Done
|
||||
10
|
Tires
and rims
|
Wheel Works to mount 2 sets
|
||||
11
|
Check
tire pressures
|
Z – 30 f 29 r
D – 29 f/r |
||||
12
|
Strut tower
support
|
Done
|
Done
|
|||
13
|
Springs
and Perch Inspection
|
Done
|
||||
14
|
Brake
Bias
|
Done
|
Done
|
|||
15
|
Brake
Cooling
|
Inspect
and repair
|
||||
Safety
Systems
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Check
fire extinguisher
|
Done
|
Done
|
|||
2
|
Fire suppression
system
|
Done
|
Done
|
|||
3
|
Check seat
|
Done
|
Done
|
|||
4
|
Check
back rest
|
Done
|
Done
|
|||
5
|
Check
seat harness
|
Done
|
Done
|
|||
6
|
Check
mirrors
|
Done
|
Done
|
|||
7
|
Roll
bar pad
|
Done
|
Done
|
|||
8
|
Check
tow hitch
|
Make
sure they are labeled
|
||||
9
|
Cover
remaining glass
|
Done
|
||||
10
|
Secure
roll cage
|
Done
|
||||
11
|
Arm
restraints / driver net
|
Done
|
||||
12
|
Fire
wall inspection
|
Done
|
||||
13
|
Battery
disconnect outside
|
Done
|
Done
|
|||
14
|
Main
battery secured
|
Done
|
Done
|
|||
15
|
Rear
fire wall
|
Done
|
||||
16
|
Windshield
|
Done
|
Done
|
|||
17
|
Fuel
system and vent line
|
Done
|
Done
|
|||
Chassis
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Wipers
|
Done
|
||||
2
|
Front
skirt
|
Done
|
Review
midskirt
|
|||
3
|
Rear
diffuser
|
Done
|
Done
|
|||
4
|
Rear
spoiler
|
Done
|
Done
|
|||
5
|
Door
Latch Inspection
|
Done
|
||||
6
|
Door
Panel Repair
|
|||||
7
|
Fender
repair
|
|||||
8
|
Front
and rear bumpers
|
|||||
9
|
Jack
points
|
Done
|
Done
|
|||
10
|
Hood
|
Done
|
Adjust
the Z
|
Pit
and Logistics Systems
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Hotel
room confirmation and number of rooms confirmed
|
Done
|
Done
|
4 Room
at Ramada
|
||
2
|
Reserve
tow truck
|
Done
|
Done
|
Z - Daws
Hammer
D -
Pansy II- Sparky
|
||
3
|
Reserve
trailer
|
Done
|
Done
|
Z- FJM
Trucking Rental
D- Torch’s
Trailer
|
||
4
|
RV
rental
|
Done
|
Done
|
RV
pending rental
|
||
5
|
Menu
|
In
Process
|
||||
6
|
Residual
value memo to Marilee
|
|||||
7
|
Check
radio harness
|
|||||
8
|
Ear
buds for radio
|
|||||
9
|
Radio
|
7 Radios
|
||||
10
|
Drivers
Schedule
|
|||||
11
|
7x5-gallon
carboy
|
Done
|
Done
|
|||
12
|
Fuel
storage
|
8x5
gallon – Need 2 new cans built up
|
||||
13
|
Pump
|
Done
|
Done
|
|||
14
|
Inspect
Pit Fire Extinguisher
|
Done
|
Done
|
|||
15
|
Spare
parts
|
Final
Inventory review
|
||||
16
|
Pack
for the track
|
|||||
17
|
Test
drive
|
|||||
18
|
Binder
|
|||||
Décor
|
||||||
Items
|
Comments
|
|||||
1
|
Car
number
|
Check
|
||||
2
|
Team
logo
|
Print
Logo and install
|
||||
3
|
VLE
logo
|
Print
Logo and install
|
||||
4
|
Paint
|
Touch
Up
|
||||
5
|
Team
Logo for Padlock
|
Done
|
Done
|
Print
|
(Key to colors:)
Green
|
Ready for track
|
Yellow
|
Have all parts
needed just need to inspect and complete
|
Red
|
Need parts
and/or plan
|
No comments:
Post a Comment