Monday, September 12, 2016

Prepring For Button Turrible

This last weekend we did get a lot of good work done.  The most shocking discovery was the front end of the Z.  When August first tested it appear like the wheel bearing was shot.  However, a closer look showed that the King Bearing or upper ball joint is done on the left side.  There is also a lot of play in the upper mount and a new bushing is needed.  This likely the result of Curbs not being our friends.  In the end alignment is not possible, so the Z was pushed aside for the D.

On the D the process of coming back from complete suspension remove is painful.  Lugnut, got is so only fine tuning is need to complete the D.  After that Torch and I did many odds and ends.  So, in review with 18 days before we head to the track here is the punch list:

Work Checklist for 2016 Button Turrible







Electrical Systems
Status



Items
300z

Type D
Comments

1
Power disconnect switch
Done

Done
Test

2
Dashboard / Gages





3
Alternator light
Done




4
Descuzzify wires


Done
Remove ABS Wiring

5
Main power battery hookups
Done

Done


6
Traqmate





7
Battery charged





8
Check charging system
Done




9
Switch for the cooling seat



Inspect

10
Start button
Done




11
Cooling fan
Done




12
Idiot light system





13
Racer Connect System - Car



Camera Setup

14
Racer Connect System - Pit



Phone setup – Laptop - Monitor







Engine and Drivetrain






Items
300z

Type D
Comments

1
Engine compress test
Done

Done
Z-  1-170, 2-160, 3-160, 4-160, 5-160, 6-159

D1-170,2-165, 3-165, 4-170

2
Spark plug
Done

Done


3
Replace oil filter





4
Replace engine oil





5
Check transmission oil


Done
Need 8 quarts for race

6
Check differential oil


Done


7
Check clutch fluid





8
Inspect timing belt





9
Inspect water and alt belt



Z-Replace

10
Check air box
Done


D- Seal

11
Check and add water to radiator
Done

Done


12
Check and add water to overflow





13
Inspect throttle cable
Done




14
Oil cooler and lines inspection
Done




15
Run engine to temperature





16
Radiator






17
Radiator screen
Done











Suspension and Brakes






Items
300z

Type D
Comments

1
Check strut and tighten





2
Inspection ball joint
Done

Done
Z-Replace Upper Ball Joint

3
Check wheel bearings
Done

Done


4
Front and rear sway bar mount


Done


5
Check rear and front bushing


Done
Z- Replace

6
Check rotors
Done

Done


7
Check brake pads
Done

Done


8
Bleed brake lines





9
Alignment



Working on that

10
Tires and rims


Done
Mont new set of tires

11
Check tire pressures



Z – 29 f 28 r D – 28 f/r

12
Strut tower support


Done


13
Springs and Perch Inspection
Done

Done


14
Brake Bias
Done

Done
D – Acquire and add

15
Brake Cooling
Done










Safety Systems






Items
300z

Type D
Comments

1
Check fire extinguisher
Done

Done


2
Fire suppression system
Done


Install

3
Check seat
Done

Done


4
Check back rest


Done


5
Check seat harness
Done

Done


6
Check mirrors
Done

Done


7
Roll bar pad
Done

Done


8
Check tow hitch



Make sure they are labeled

9
Cover remaining glass
Done

Done


10
Secure roll cage
Done

Done


11
Arm restraints / driver net


Done


12
Fire wall inspection
Done

Done


13
Battery disconnect outside





14
Main battery secured





15
Rear fire wall
Done

Done


16
Windshield
Done

Done


17
Fuel system and vent line
Done

Done








Chassis






Items
300z

Type D
Comments

1
Wipers



Most likely not needed.

2
Front skirt





3
Rear diffuser





4
Rear spoiler
Done




5
Door Latch Inspection





6
Door Panel Repair





7
Fender repair
Done

Done


8
Front and rear bumpers
Done

Done


9
Jack points
Done

Done



Pit and Logistics Systems






Items
300z

Type D
Comments

1
Hotel room confirmation and number of rooms confirmed
Done

Done
6 Room at Roadway Inn

2
Reserve tow truck



Z - Daws Hammer
D - Pansy II- Sparky

3
Reserve trailer


Done
Z Travel’yn Toys
D- U-Haul

4
RV rental
Done

Done
RV pending rental

5
Menu





6
Residual value memo to Marilee





7
Check radio harness





8
Ear buds for radio





9
Radio



7 Radios

10
Drivers Schedule





11
7x5-gallon carboy
Done

Done


12
Fuel storage
Done

Done
6x5 gallon

13
Pump





14
Inspect Pit Fire Extinguisher





15
Spare parts





16
Pack for the track





17
Test drive





18
Binder





19
Install seat cooler and test











Décor






Items



Comments

1
Car number



Need 12 x 11x17 label

2
Team logo



Review

3
VLE logo



Inspect

4
Paint



Touch Up

5
Team Logo for Padlock



Print

No comments:

Post a Comment