Wednesday, September 9, 2015

Last Stretch to Get Us Ready

Here is the list of the last items to get the cars ready for Vodden.

Work Checklist for 2015 Thunderhill Vodden the Hell







Electrical Systems
Status



Items
300z

Type D
Comments

10
Switch for the cooling seat



Inspect

12
Cooling fan



Possible auto switch to be installed







Engine and Driver train






Items
300z

Type D
Comments

3
Replace oil filter
Done


D - Install new filter housing

11
Check and add water to radiator


Done


12
Check and add water to overflow





14
Oil cooler and lines inspection
Done


D - Add new cooler and lines.
D - Install new system

15
Run engine to temperature
Done











Suspension and Brakes






Items
300z

Type D
Comments

3
Check wheel bearings


Done
Z-Replace

9
Alignment


Done


10
Tires and rims


              
D – 4 tires need mounting

11
Check tire pressures



Z – 29 f 28 r D – 28 f/r







Safety Systems






Items
300z

Type D
Comments

8
Check tow hitch



Make sure they are labeled







Chassis






Items
300z

Type D
Comments

2
Front skirt


Done
Z – Create new shirt

6
Door Panel Repair


Done
Z – Passenger side door dent


Pit and Logistics Systems






Items
300z

Type D
Comments

7
Menu



In Process (Pizza likely)

9
Check radio harness





11
Radio



7 Radios

13
6x5-gallon carboy



Repair fill can and inspect others

18
Pack for the track





21
Install seat cooler and test











Décor






Items



Comments

1
Car number



Need 12 x 11x17 label

4
Paint



Touch Up

No comments:

Post a Comment