Tuesday, March 15, 2011

10 days to go.

This weekend will be a big work weekend. I plan on going at it for both days, so if anyone is around this weekend come on by. Also, for you drivers the seat will be moving down. To compensate we are looking to place wedges under the seat to bring you up some.

As for work, here is the punch list:

2011 Sears Pointless

Electrical Systems

Items

Status

Comments

1

ECU replacement

Done

2

Reinstall Tack

Done

3

Reinstall Traqmate

Done

4

Fix the Nissan Consult so we can plug in a laptop

Possible rewire

5

Look for error messages

6

ECU Tune

7

Run car with computer connected to consult monitoring systems

8

Camera Height Review

Done

9

Test Oxygen Sensor

10

New Start Switch

Done

Engine and Driver Train

Items

Status

Comments

1

Engine compress test

Done

1- 190, 2 -180, 3- 190, 4-175, 5-200, 6-180

2

Vacuum test

Done

900 rpm 51 inHg

3

Test water temperature sensor

Done

4

Test fuel level sensor

Done

Replace Transmission

Done

5

Install exhaust system

Done

6

Change motor oil

Done

7

Install Rear Differential

Done

8

Change Extension Oil Seal

Done

9

Replace drive line

Done

10

Reattach Half Shafts

Done

11

Add Gear oil to Transmission

Done

Have Oil

12

Added Gear oil to Differential

Done

Have Oil

13

Check water level

Done

14

Check water pump

Done

15

Test clutch

Done

16

Pull Goldies Rear Differential

Done

Suspension

Items

Status

Comments

1

Added adjustable camber to rear wheels

Done

2

Install front strut tower support

Done

Have parts

3

Check strut and tighten

4

Check Wheel bearings

Done

5

Replace swaybar bushing

Done


6

Front alignment

Done

7

Steering Wheel Quick Release

Brakes System

Items

Status

Comments

1

Inspect brakes

Done

2

Brake Bias options/balance

Done

3

Removal Rear brake Covers

Done

4

Bleed Brakes

Done

5

Replace Brake Pads


Have Hawk 9012 and will replace after First day run

Pit and Logistics Systems

Items

Status

Comments

1

Hotel room confirmation and number of rooms confirmed

Done

6 Room at Travelodge (two rooms taken)

2

Reserve tow truck

Done

Daws

3

Reserve trailer

Done

US Rental flat bed

4

RV rental

Done

RV pending rental

5

T-shirt printing

Done


6

Team Hat

Done

7

Menu

8

Residual value memo to Jay


Sent to him

9

Radio Head Set

Done

10

Ear Buds for radio

Done

5 ordered

11

5x5-gallon carboy

Done

12

Pack for the track

13

Replace team logo on Hood

Done

14

Refresh paint

Done

15

Patch flat tire

Done

16

Test drive

Done

17

Binder

Safety

Items

Status

Comments

1

Install Doors

Done

2

Roll Bar reinforcement

Done

3

Box Driver side Support

Done

4

Add new Knee Bar

Done

5

Paint Welds

Done

6

Roll Bar Padding

Done

7

Driver Seat

Done

8

Driver Harness

Done

9

Reinstall Driver Seat Back Brace

Done

10

Driver Fit Test

Done

11

Rules Review

Done


Muddy

1 comment:

  1. Nice work by all today. We got a lot of the punch list items done. Task left are about getting the car on the trainer, RV pack and off to the track.

    ReplyDelete