Friday, December 3, 2021

Arse Freezes 2021 - Early Prep ()

We have made it!  Trailer is packed and the RV needs the final cooler tomorrow before we lunch.

Project work took until this morning to get done. Here is a list of the various items completed today:

  • Finish the front end project
  • Paint
  • Freshen up the Car  numbers
  • Install the rear diffuser
  • Finish the fuel pump connections
  • Weigh and cross balance the car
  • Alignment
  • Pack and load was also to complete.

One fun item was the weigh balance. Unload the car weighs 2863. We have about 10 gallons in the tank, so +- 2800 empty. This is in line with previous unload weight in the 2,800 range. Here is the final balance result: