Prep work for Sears Pointless continued over this weekend. Queen, Torch, and I work through many of the final identified project task and on the punch list. As for the D, it will need a light once over for paint, but essentially it is ready for the track. On the Z we had a bit of a battle for the fuel system. From Wednesday work, we were able to get the high pressure system to work, but only saw just above 30psi. I thought it was the prefilter, so on Saturday that was changed out. When the system was then tested on Saturday we had no pressure. A quick test told use the pump had expired. A new one was acquired and put on line today, and yes, we now have fuel pressure to the rail:

We now have two cars running, Phew!!!!

Now to get them track ready here is the final punch list items:


Electrical Systems
Status





Items
300z

Type D
Comments



1
Racecapture /Traqmate


DONE
Secure wires for network phone.



2
Battery charged


DONE
Z- Charge 











Engine and Drivetrain








Items
300z

Type D
Comments



3
Check new fuel system for leaks.


DONE




4
Finish Cover Fuel System


DONE
Install insolation
Install Cover
Paint - White









Suspension and Brakes








Items
300z

Type D
Comments



5
Tires and rims



D- Needs 1 Tire
Z- four spares



6
Springs and Perch Inspection


DONE
Z- Set locking ring to rear struts


















Safety Systems








Items
300z

Type D
Comments



7
Check tow hitch



Make sure they are labeled







Pit and Logistics Systems







Items
300z

Type D
Comments


8
Hotel room confirmation and number of rooms confirmed



5 Room at Courtyard Inn 


9
Reserve tow truck



Z - Daws
D – Torch/Picasso

10
Reserve trailer



Z FMJ
D- 


11
Residual value memo to Marilee






12
7x5-gallon carboy 



Check caps and tighten Value


13
Pack for the track






14
Binder













Décor







Items
300z

Type D
Comments


15
Paint



Tape and Touch Up