Work continues to get us ready for Arse-Freeze

Yep, we had a group work today to get these cars ready.  The most successful item was the installation of the rebuild transmission back into the D.  Lugnut and Torch were able to jump on that first, completed the install, and had the car running before lunch.  Nice!

After lunch Torch and Lugnut helped me continue with the Z's new engine installation pep.  After todays work here is a list of items, I beleive is still the needed updated for the Z engine installation to be complete:
  • Engine mounts
  • Cross member and steering colum edits
  • Transmission cross member and alignment
  • Cooling system
  • Oil cooling system
  • PCV system removal
  • Intake line to MFC
  • Exhaust system
  • Clutch placement 
  • Throttle setup
  • Starter hookup
  • Alternator/power steering belt sized and changed
  • Power steering lines
  • Drive line
  • Electrical system
Well, at least we know and have time to get these items off the list.