And Then There Was 12 Days

We had a busy last two days working on the car. Tow an I put the final touches on the need to have with the replacement on the loose half shaft bolts and a few checklist issues. The biggest achieve of the day was work done by Tow Junior. I think he completed an unrelated science project as he used the quiet of the house and the reward of firing up the car when he finished.  

Today, Torch and I polished off the rest of the mechanical checklist. We even got a test drive in. THe test drive did uncover some issues including; lunching hood pins (Torch I have found both), new rattles from underneath ( most like the exhaust system), new click when changing gears (we think the clutch slave), leaving tire marks as I locked up unbiased cold rear tires (just work out a flat spot), and basically disappointing the neighbors to the trash that lives in their neighborhood.

As for additional work, there is the touch painting, completion of the idiot light system, and general loading, before we can hit the track. So, in the end, I think the car is ready to enjoy Turkey and have a nice run afterward.



2013 Arse Freeze - Searspoint









Electrical Systems
Status




Items
300z

Comments

1
Power Disconnect switch
Done



2
Dashboard gauges inspection
Done



3
Check alternator light and power generation
Done



4
Descuzzify wires
Done



5
Battery Box
Done



6
Cyclopes rear light check
Done



7
Main Power Battery Hookups
Done



8
Install Traqmate/Wifi Lapper
Done



9
Battery Charged
Done



10
Drive Warring Light


Panel build, controlled, install






Engine and Driver train





Items


Comments

1
Engine compress test
Done

Z: 1- 190, 2 -180, 3- 180, 4-180, 5-180, 6-170                                    

2
Spark Plug
Done



3
Replace oil filter
Done



4
Replace oil
Done



5
Check transmission oil
Done



6
Check Differential Oil
Done



7
Check Clutch Fluid
Done



8
Inspect Timing Belt


Hope nothing bad happens

9
Inspect Water and Alt Belt
Done



10
Check Air Box
Done



11
Check and add Water to Radiator
Done



12
Test Cooling Fan
Done



13
Inspect and/or replace throttle Cable
Done



14
Wipers
Done



15
Run engine to temperature
Done



16
Test Drive
Done



17
Half-Shaft bolts / Drive line
Done



18
Drive Line Bolt Test
Done



19
Exhaust muffler Installation
Done















Suspension and Brakes





Items


Comments

1
Check strut and tighten
Done



2
Inspection Ball Joint
Done



3
Check Wheel bearings
Done



4
Front Sway bar mount
Done



5
Check rear and front bushing
Done



6
Check Rotors
Done



7
Check Brake Pads
Done



8
Bleed brake lines
Done



9
Check Brake booster
Done



10
Alignment
Done



11
Tires and Rims
Done



12
Check Tire Pressures


On track

13
Strut Tower Support
Done



14
Wheel Studs
Done








Safety Systems





Items


Comments

1
Check Fire Extinguisher
Done



2
Check Seat
Done



3
Check Back Rest
Done



4
Check Seat Harness
Done



5
Check Mirrors
Done



6
Roll Bar Pad
Done



7
Check Tow Hitch
Done



8
Cover Remaining Glass
Done



9
Secure Roll Cage
Done



10
Arm Restraints / Driver Net
Done



11
Fire Wall Inspection
Done



12
Battery Manual Disconnect
Done



13
Rear Fire wall
Done



14
Front Bumper/Fender repair
Done



15
Driver seating pads
Done









Décor





Items


Comments

1
Car Number
Done



2
Team Logo
Done



3
VLE Logo
Done



4
Paint


Touch up on Friday