Project work took until this morning to get done. Here is a list of the various items completed today:
- Finish the front end project
- Paint
- Freshen up the Car numbers
- Install the rear diffuser
- Finish the fuel pump connections
- Weigh and cross balance the car
- Alignment
- Pack and load was also to complete.
Sunday, November 7, 2021
Arse Freezes 2021 - Early Prep (Brake Upgrades)
To start, I do like the performance of the current brakes on the Z. We are running the StopTech Sport Slotted Cryo Rotors and Hawk Performance DC-60 brake pads. However, since this is an arms race, improvements are always the goal. With that in mind, there are two items that I would like to improve the brakes.
The first upgrade is to get an increase in brake pad longevity. Currently, when we run the car for the 7-8 hr we are going through about 60% of the Hawk DC-60 front brakes. This means we replace pads after every major stint. Looking around, I have been able to find and believe we can upgrade to a mixed version of 350z rotors and caliper setup "with a little bit of help with an A-daptor kit". The router and pads are the same material, so this should increase pad and rotor size by ~15% and keep the desired performance. Even as the car evolution continues, and we get faster, this increase in brake size should see brake wear get below the 45% per stint and allows for one set of brakes per weekend.
The front brake change will exacerbate the second issue. The brakes are too sensitive and lacks the preferred fidelity. The cause of this we believe is the bore size of the master cylinder. We have examined the unit, and it is stated to be a 17/16", Torch measured it and the bore size is really only an 1". This has proven to be a consistent problem as I have sourced Master other OEM cylinder from three other manufactures and all were found to be 1". Thus, upgrading to the 350z brakes, we will then really have a hot mess.
Normally the solution is to increase bore size. Since we are have such trouble with this, I am thinking of going to a Wilwood Master Cylinder setup. They have 17/16" and 9/8" bore size options. Now the question is just changing bore size be enough?
To answer that question, we need to look into braking pressure. I don't know the peddle's ratio, so this will be all a guess from a 7:1 @ 100 lbs peddle pressure chart I found (shown below). From this, my guess is that we want to drop 200-300 psi to give us some better feel. Then, moving forward with the proposed 350z break system, if I assume a linear increase of brake size to pressure, a 15% increase in brake size could result in a relative increase brake pressure of 250-300psi. Looking at those combined number, we are looking at a 450-600 psi brake pressure drop. Bore size change is not going to cover that, so our attention turns to the brake boosters.
Looking at the brake booster, the 300z and the 350z diaphragms are similar in size, so no help. This had me look, at the Nissan's 240SX single 9.55" booster. The booster did have the same mount points as the Z, except the studs were about an 1" short. No trouble. With some welding by Torch, we had some stud extension, and it fit right in. So now, I estimate that we get a brake pressure reduction of about -225 psi. This might be enough reduction to give us better brake sensitivity in our current setup. We will find out in about 4 weeks.
Then, when we move to the 350Z brake system, I would propose changing the master cylinder from the current 1" to the Wilwood 9/8" bore. The referenced chart indicate that we would get a brake pressure change of ~ -320 psi, and with hope matches the 350z brake increase.
How could any of this cause a problem?
Thursday, November 4, 2021
Arse Freezes 2021 - Early Prep (continues)
Work on the Z has continued, with some headway being made. We still have most of the major work still to finished before getting into the punchlist. I am think in the next two weekends we should be able to complete these changes. Here is a review of the three major projects:
Front Bumper rework
The one area I have plugging away at for most of the fall is the front bumper area. It has been an ambitious project, and we will see if it is worth the endeavor. The general framing, ducts, and vents have been completed. Here is the front leftside view:
The trouble we ran into is that literally that the pictured swirl pot would be fitting a square pot into a smaller round port. So, the search was on and what we found was a waste product out of the Hal-Life Racing HQ kitchen.
Wednesday, October 13, 2021
Arse Freezes 2021 - Early Prep
Sorry for leaving you hanging. Blogging in racing is hard for me. I look forward to the next race, where I will see if Sparky can help with the race communication. As for the last April race, we get the cars going at Sonoma. We tried way too hard to ruin that.
We started Saturday well with both cars running through their first stints. Things got tougher after that. The Z got parked from contact damage to the right front, which resulted in some suspension bending. While the Z was still going through the repair process, the Miata in its maiden Lemons run, developed an oil leak from some teething issues. We caught that before it did real damage. It still put the car up on blocks for several hours. Here is that disturbing image, as rumblings and roaring were coming from over yonder on the green flagged track.
Both cars did get their repairs completed, and valuable race labs were run.
On Sunday the Miata did a Miata thing, it just kept running. Driver change and fuel adding was the cause of any stops. The Z ran afoul with more of the contact bug. Again we saw some fair amount of time off track. We also discovered a fuel problem. With the higher heat, we found at low fuel, the lift pumps overheat and blow the pump fuse. It is suspected to have caused the major incident (car crash). After refueling and replacing a fuse, we sent the car on its merry way. In the end, both cars did finish both days. Yeah Us!!!!
Now moving forward. We are schedule to race in the Lemons Arse-Freeze Apalooza on December 4 and 5th. To get ready for this, we do have a list of work to completed before we can get to the punch list. Here is the list of work that has started and will need to be completed in about a month for us to be ready:
Task | Status | Notes: | |
Driver’s Seat | |||
Change the Z ‘s floor pan, install seat sliders. | Done | Torch did all of that work. | |
Fuel System | |||
Restore fuel lines from Z’s seat installation. | Have compression fittings and piping. Install required. | ||
Install new fuel pump in the tank. | Walbro in-tank high pressure pump acquired. Some assembly required. | ||
Connect lower fuel tanks to allow transfer of fuel from the lower lobs of the tank. | Have compression fittings and piping. Need a check valve and Install required. | ||
Brake System | |||
Change brake booster to provided better brake feel. | Brake booster ordered awaiting arrival and installation. | ||
Restore rear brake lines from Z seat installation. | Need compression fitting and Install required. | ||
Reinstall brake calipers | |||
Rebuild Front Bumper | |||
Rebuild the front end of the Z. Add vents, splitter, and bumper support. | Fabricate, weld, tape, and paint. | ||