The rain has stayed away and we are cleaning the pits getting ready for the checkers.
Sunday, December 7, 2014
Final driver changes done
Lugnut is in the Z and Torch is in the D. The Z is now 2 laps ahead and running in 58th out of 175 cars.
2 checkers!
The Z ended up 52 with 285 laps and the D 57th with 282. A great weekend with everything running smooth.
Final driver changes done
Lugnut is in the Z and Torch is in the D. The Z is now 2 laps ahead and running in 58th out of 175 cars.
The rain has stayed away and we are cleaning the pits getting ready for the checkers.
29 seconds
We have been haveing a very clean day. Both cars have just finished their second to last drivers changes and once done they are on the same lap 29 seconds apart. Muddy is in the Z and Queen is in the D with the Z just ahead. Next up well move Lugnut and Torch into the cars and finish the day.
First driver change
We made it through the first session, although the z needed a warning from the judges after a spin on the first lap out of the pits. Once the track warmed up however, no more incidents.
The two cars are 1 lap apart with the D in front. We have one more pit scheduled for the Z today as well so that is probably the order they will finish.
Day 2
We are starting out today with a lovely sunrise, but a forecast of rain to sweep in at 3:00. We are excited to at least be starting with sunshine
Saturday, December 6, 2014
Day 1 done
Lovely evening.
The cars finished 1,2 at the end. Everyone was all smiles. Now the triage begins.
The z ran hot the full final stint. The fan was full of junk which has now all been removed and it is working. The bigger problem is te air intake to the radiator collapsed somewhere during the day. The welder is coming out and we'll have a new air box shortly.
The d is getting a new set of brakes then I think we'll call them good.
10 min to checker
After a wet start, the day has gotten much dryer and the cars have been running quick. We had 1 black flag for a spin, but other than that the drivers have behaved.
The Z came in hot one stint, with the temp gauge past at the top of the range. We had a leaking hose, and a fan that got stuck with debris. We had to cool it off and we sent muddy out with the instructions to watch the temp and bring it home.
Tow is out in the final stint in the D. The cheap brake bass we bought this morning are almost gone, so his stint was to watch the brakes. Given 10 minutes to go, both have done well.
Day 1
We were off to a wet and cold start this morning.
The cars are ready to go and we will try blueberry in the Z and Sparky in the D. With the wet track, the goal is just to keep them on the track and out of trouble.
The hats have been a great hit and look good in the window of the RV.
------
Now finished the first session, everything went smooth, for us.
The tow truck guys have been busy though, and there was a car that caught fire. After which the fire engine got stuck and needed a tow.
Second sessions we have Tow and Torch on the track as we move towards lunch.
Friday, December 5, 2014
Test laps
We haven't had rain in a while but the track is wet and slippery. Muddy re-earned his moniker and tow is also having issues in the D.
The Z is running fast and everyone is coming out happy.
Passed tech
The drive was smooth, setup went too easy and we sat around waiting for tech to open.
Muddy has often mentions his aspiration is to be like Audi at the real lemans. While everyone is running around, they are calmly washing the cars.
Well while we were waiting for tech, muddy got his wish. The question was asked, "should we be doing anything". And the answer was no, we were actually done and prepped! Go Muddy, a real Audi moment.
Tech was uneventful, except the hair and paint on the cars got a lot more attention than we normally get. Both cars ended up in class A with no laps.
The only issue we had was Lugnuts license has expired. We have not w sent him off to the DMV. Good thing it is Friday and they are open.
More in a bit. Lunch time the getting the cars on track for practice.
Passed tech
The drive was smooth, setup went too easy and we sat around waiting for tech to open.
Muddy has often mentions his aspiration is to be like Audi at the real lemans. While everyone is running around, they are calmly washing the cars.
Well while we were waiting for tech, muddy got his wish. The question was asked, "should we be doing anything". And the answer was no, we were actually done and prepped! Go Muddy, a real Audi moment.
Tech was uneventful, except the hair and paint on the cars got a lot more attention than we normally get. Both cars ended up in class A with no laps.
The only issue we had was Lugnuts license has expired. We have not w sent him off to the DMV. Good thing it is Friday and they are open.
More in a bit. Lunch time the getting the cars on track for practice.
Passed tech
The drive was smooth, setup went too easy and we sat around waiting for tech to open.
Muddy has often mentions his aspiration is to be like Audi at the real lemans. While everyone is running around, they are calmly washing the cars.
Well while we were waiting for tech, muddy got his wish. The question was asked, "should we be doing anything". And the answer was no, we were actually done and prepped! Go Muddy, a real Audi moment.
Tech was uneventful, except the hair and paint on the cars got a lot more attention than we normally get. Both cars ended up in class A with no laps.
The only issue we had was Lugnuts license has expired. We have not w sent him off to the DMV. Good thing it is Friday and they are open.
More in a bit. Lunch time the getting the cars on track for practice.
Sunday, November 30, 2014
Work List Left for Arse-Freeze Alapolooza
Work
List for 2014 Arse-Freeze Alapolooza
|
||||||
Electrical
Systems
|
Status
|
|||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Power
disconnect switch
|
Done
|
Done
|
|||
2
|
Dashboard
/ Gages
|
Done
|
Done
|
|||
3
|
Alternator
light
|
Done
|
Done
|
|||
4
|
Descuzzify
wires
|
Done
|
Rewire
Z
|
|||
5
|
Main
power battery hookups
|
Done
|
Done
|
|||
6
|
Install
Traqmate
|
Done
|
D- Install
Traqmate
|
|||
7
|
Battery
charged
|
Done
|
||||
8
|
Check
charging system
|
Done
|
Done
|
|||
9
|
Check
ECU error codes
|
Done
|
||||
10
|
Cooling seat
system
|
N/A
|
N/A
|
|||
11
|
Start button
|
Done
|
Done
|
|||
12
|
Fan switch
|
Done
|
Done
|
|||
13
|
Idiot light system
|
Done
|
Print
Labels
|
|||
14
|
ABS switch
|
|||||
Engine
and Driver train
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Engine
compress test
|
Done
|
Done
|
Z-
D1-185,2-185,
3-185, 4-180
|
||
2
|
Spark plug
|
Done
|
Done
|
|||
3
|
Replace
oil filter
|
Done
|
Done
|
|||
4
|
Replace
engine oil
|
Done
|
Check D
|
|||
5
|
Check transmission
oil
|
Done
|
Done
|
|||
6
|
Check differential
oil
|
Done
|
Done
|
|||
7
|
Check clutch fluid
|
Done
|
Done
|
|||
8
|
Inspect timing
belt
|
Done
|
Done
|
|||
9
|
Inspect
water and alt belt
|
Done
|
Done
|
|||
10
|
Check
air box
|
Done
|
Done
|
|||
11
|
Check
and add water to radiator
|
Done
|
Done
|
|||
12
|
Check
and add water to overflow
|
|||||
13
|
Cooling
fan
|
Done
|
Done
|
|||
14
|
Inspect
and replace throttle cable
|
Done
|
Done
|
|||
15
|
Oil
cooler and lines inspection
|
Done
|
||||
16
|
Run
engine to temperature
|
Done
|
||||
17
|
Test
rear differential
|
Done
|
Done
|
|||
18
|
Radiator
screen
|
Done
|
Done
|
|||
19
|
Shifter
bushing
|
Done
|
||||
Suspension
and Brakes
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Check
strut and tighten
|
Done
|
Done
|
|||
2
|
Inspection
ball joint
|
Done
|
Done
|
|||
3
|
Check
wheel bearings
|
Done
|
Done
|
|||
4
|
Front
Sway bar mount
|
Done
|
Done
|
|||
5
|
Check
rear and front bushing
|
Done
|
Done
|
|||
6
|
Check
rotors
|
Done
|
Done
|
|||
7
|
Check
brake pads
|
Done
|
Done
|
|||
8
|
Bleed
brake lines
|
Done
|
Done
|
|||
9
|
Check
bias
|
Done
|
Done
|
|||
10
|
Alignment
|
|||||
11
|
Tires
and rims
|
Done
|
Done
|
|||
12
|
Check
tire pressures
|
|||||
13
|
Strut tower
support
|
Done
|
||||
14
|
Brake
Cooling
|
|||||
Safety
Systems
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Check
fire extinguisher
|
Done
|
Done
|
|||
2
|
Fire suppression
system
|
Battery
install
|
||||
3
|
Check seat
|
Done
|
Done
|
|||
4
|
Check
back rest
|
Done
|
Done
|
|||
5
|
Check
seat harness
|
Done
|
Done
|
|||
6
|
Check
mirrors
|
Done
|
Done
|
|||
7
|
Roll
bar pad
|
Done
|
Done
|
|||
8
|
Check
tow hitch
|
Find Z
Tow Hitch
|
||||
9
|
Cover
remaining glass
|
Done
|
Done
|
|||
10
|
Secure
roll cage
|
Done
|
Done
|
|||
11
|
Arm
restraints / driver net
|
Done
|
Done
|
|||
12
|
Fire
wall inspection
|
Done
|
Done
|
|||
13
|
Battery
disconnect outside
|
Done
|
||||
14
|
Main
battery secured
|
Done
|
Done
|
|||
15
|
Rear
fire wall
|
Done
|
Done
|
|||
16
|
Windshield
|
Done
|
Done
|
|||
Chassis
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Wipers
|
Done
|
Done
|
|||
2
|
Front
skirt
|
Done
|
Done
|
|||
3
|
Rear
diffuser
|
Design
and install- not
|
||||
4
|
Rear
spoiler
|
Done
|
Done
|
|||
5
|
Fender
repair
|
Done
|
Done
|
|||
6
|
Front
and rear bumpers
|
Done
|
Done
|
|||
7
|
Jack
points
|
Done
|
Done
|
Pit
and Logistics Systems
|
||||||
Items
|
300z
|
Type D
|
Comments
|
|||
1
|
Hotel
room confirmation and number of rooms confirmed
|
Done
|
Done
|
5 Room
at Ramada
|
||
2
|
Reserve
tow truck
|
Done
|
Daws /
Need a second
|
|||
3
|
Reserve
trailer
|
Done
|
Pending
Contact from Tarvlyn Toys
|
|||
4
|
RV
rental
|
Done
|
Done
|
RV
pending rental
|
||
5
|
T-shirt
printing
|
Done
|
Done
|
|||
6
|
Team
hats and jackets
|
|||||
7
|
Menu
|
Done
|
Done
|
|||
8
|
Residual
value memo to Jay
|
Pending Response
|
||||
9
|
Check
radio harness
|
Z install and
check
|
||||
10
|
Ear
buds for radio
|
Done
|
Done
|
|||
11
|
Radio
|
Done
|
Done
|
7 Radios
|
||
12
|
Drivers
Schedule
|
|||||
13
|
5x5-gallon
carboy
|
Done
|
Need
to setup 5 carboys need gasket
|
|||
14
|
Fuel
storage
|
Done
|
Done
|
8x5 gallon
|
||
15
|
Pump
|
Done
|
Done
|
|||
16
|
Spare
parts
|
Done
|
Done
|
|||
17
|
Pack
for the track
|
|||||
18
|
Test
drive
|
|||||
19
|
Binder
|
Edit D's and Z binder
|
||||
20
|
Install
seat cooler and test
|
N/A
|
N/A
|
|||
Décor
|
||||||
Items
|
Comments
|
|||||
1
|
Car
number
|
Done
|
Need
11x17 label
|
|||
2
|
Team
logo
|
Done
|
Done
|
|||
3
|
VLE
logo
|
Done
|
Done
|
|||
4
|
Paint
|
(Key to colors:
Green
|
Ready for track
|
Yellow
|
Have all parts
needed just to inspect and complete
|
Red
|
Need parts
and/or plan
|
Subscribe to:
Posts (Atom)